← Back to map

Antelope Big Sky Ranch

Los Angeles County, California · EIA plant ID 60279 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 19 MW
Generators1in service
Net generation50GWh12 mo to Dec 2025
Capacity factor30%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202630.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201617.123.2%—
201756.432.2%—
201857.334.4%—
201955.233.1%—
202052.131.2%—
20215130.7%—
20225231.3%—
202345.827.5%—
20245432.3%—
202549.930.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ABSRSolar PhotovoltaicPV2019Aug 2016Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%20 MW

Nearby plants

Within 80 km.
Central Antelope Dry Ranch B LLC3 MW1.7 km
Lancaster Area Battery127 MW1.8 km
Horn2 MW2 km
Luna Storage100 MW2.1 km
Rodeo Solar C22 MW2.1 km
Rodeo Solar D22 MW2.1 km