El Cajon Energy Storage

San Diego County, California · EIA plant ID 60569 · Operator: San Diego Gas & Electric Co
BatteryBatteriesCAISOBA: CISO
Nameplate8MWSummer 8 MW
Generators1in service
Net generation-0GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-150-100-50050100MWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20170.9——
2018-1.2——
2019-0.9——
2020-0.7——
2021-0.8——
2022-0.7——
2023-0.6——
2024-0.7——
2025-0.6——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SESBatteriesBA7.57.5Feb 2017Operating—coming soon

Owner / operator

Operator: San Diego Gas & Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
San Diego Gas & Electric Co100.0%8 MW

Nearby plants

Within 80 km.
Elliott Energy Storage10 MW3.6 km
San Diego State University15 MW4.1 km
Grossmont College3 MW4.2 km
ISH Solar Hospital SDMC1 MW4.7 km
Grossmont HS Solar Project1 MW4.8 km
Grossmont Hospital5 MW5.4 km