← Back to map

San Diego State University

San Diego County, California · EIA plant ID 50061 · Operator: San Diego State University
Natural gasNatural Gas Fired Combined CycleSolar PhotovoltaicCAISOBA: CISO
Nameplate15MWSummer 12 MW
Generators7in service
Net generation59GWh12 mo to Jul 2026
Capacity factor59%gas/coal/oil units, summer MW
Heat rate6,963Btu/kWhfossil units, electric fuel, HHV
First online2002Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202559.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,0006,0007,0008,000200520102015202020256,963 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200114.1——
200227.2——
200354.848.5%8,306
200465.355.9%6,074
200565.256.0%6,074
200671.561.4%6,074
200776.265.4%5,494
20087261.7%6,106
20096354.1%6,477
201067.457.9%6,408
201163.654.6%6,373
201266.456.9%6,331
201358.750.3%6,312
201471.561.3%6,257
201568.759.0%6,091
201656.648.5%6,955
201753.946.2%7,018
201856.747.3%7,000
20195444.9%6,994
202046.538.8%6,693
20215949.7%6,901
202263.453.2%6,934
202358.158.3%6,988
202460.260.6%6,977
202553.453.5%6,980

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN2Natural Gas Fired Combined CycleCT5.14.5Sep 2002Operating—coming soon
GEN3Natural Gas Fired Combined CycleCT5.14.5Sep 2002Operating—coming soon
GEN4Natural Gas Fired Combined CycleCA4.12.1Dec 2002Operating—coming soon
GEN5Solar PhotovoltaicPV0.10.1Sep 2009Operating—coming soon
GEN6Solar PhotovoltaicPV0.30.3Oct 2011Operating—coming soon
GEN7Solar PhotovoltaicPV0.30.3Apr 2012Operating—coming soon
GEN8Solar PhotovoltaicPV0.10.1Mar 2014Operating—coming soon
GEN1Natural Gas Fired Combined CycleCT2.52.9Jan 1986Retired Dec 2002—coming soon

Owner / operator

Operator: San Diego State University. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
San Diego State University100.0%15 MW

Nearby plants

Within 80 km.
ISH Solar Hospital SDMC1 MW2.8 km
El Cajon Energy Storage8 MW4.1 km
PFMG Solar Grossmont Helix LLC1 MW4.3 km
Elliott Energy Storage10 MW4.6 km
Grossmont Hospital5 MW6 km
Kearny Mesa Storage LLC1 MW6.7 km