Grossmont Hospital
San Diego County, California · EIA plant ID 10115 · Operator: Sharp Grossmont Hospital
Nameplate5MWSummer 4 MW
Generators1in service
Net generation29GWh12 mo to Dec 2025
Capacity factor79%gas/coal/oil units, summer MW
Heat rate5,743Btu/kWhfossil units, electric fuel, HHV
First online2016Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 12.7 | 90.8% | 9,026 |
| 2002 | 10.9 | 77.8% | 15,608 |
| 2003 | 10.5 | 75.3% | 8,562 |
| 2004 | 12.3 | 87.4% | 5,644 |
| 2005 | 12.3 | 87.5% | 5,644 |
| 2006 | 12.2 | 87.0% | 5,644 |
| 2007 | 10.8 | 77.0% | 5,531 |
| 2008 | 10.9 | 77.8% | 5,644 |
| 2009 | 12.7 | 90.6% | 5,531 |
| 2010 | 12 | 85.5% | 5,644 |
| 2011 | 11.6 | 82.4% | 5,531 |
| 2012 | 11.1 | 79.0% | 5,531 |
| 2013 | 5.3 | 37.6% | — |
| 2014 | 9.1 | 64.6% | 5,531 |
| 2015 | 10.9 | 77.6% | 5,531 |
| 2016 | 19.4 | 66.2% | 5,760 |
| 2017 | 24.7 | 67.2% | 5,746 |
| 2018 | 29.6 | 80.3% | 5,742 |
| 2019 | 24.9 | 67.8% | 5,932 |
| 2020 | 27.3 | 74.1% | 6,128 |
| 2021 | 29.1 | 79.0% | 5,861 |
| 2022 | 29 | 78.8% | 5,747 |
| 2023 | 27.5 | 74.6% | 5,898 |
| 2024 | 25.5 | 69.1% | 5,748 |
| 2025 | 29.2 | 79.5% | 5,743 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN3 | Natural Gas Fired Combustion Turbine | GT | 4.5 | 4.2 | May 2016 | Operating | — | coming soon |
| GEN1 | Natural Gas Fired Combustion Turbine | GT | 0.8 | 0.8 | Aug 1983 | Retired May 2016 | — | coming soon |
| GEN2 | Natural Gas Fired Combustion Turbine | GT | 0.8 | 0.8 | Aug 1983 | Retired May 2016 | — | coming soon |
Owner / operator
Operator: Sharp Grossmont Hospital. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Sharp Grossmont Hospital | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| El Cajon Energy Center | 61 MW | 3.7 km |
| North Johnson Energy Center | 50 MW | 3.7 km |
| Cuyamaca Peak Energy Plant | 49 MW | 3.7 km |
| Ventasso Energy Storage, LLC | 50 MW | 3.9 km |
| PFMG Solar Grossmont Helix LLC | 1 MW | 4 km |
| Grossmont College | 3 MW | 4.1 km |