← Back to map

Grossmont Hospital

San Diego County, California · EIA plant ID 10115 · Operator: Sharp Grossmont Hospital
Natural gasNatural Gas Fired Combustion TurbineCAISOBA: CISO
Nameplate5MWSummer 4 MW
Generators1in service
Net generation29GWh12 mo to Dec 2025
Capacity factor79%gas/coal/oil units, summer MW
Heat rate5,743Btu/kWhfossil units, electric fuel, HHV
First online2016Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202579.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
05,00010,00015,000200520102015202020255,743 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200112.790.8%9,026
200210.977.8%15,608
200310.575.3%8,562
200412.387.4%5,644
200512.387.5%5,644
200612.287.0%5,644
200710.877.0%5,531
200810.977.8%5,644
200912.790.6%5,531
20101285.5%5,644
201111.682.4%5,531
201211.179.0%5,531
20135.337.6%—
20149.164.6%5,531
201510.977.6%5,531
201619.466.2%5,760
201724.767.2%5,746
201829.680.3%5,742
201924.967.8%5,932
202027.374.1%6,128
202129.179.0%5,861
20222978.8%5,747
202327.574.6%5,898
202425.569.1%5,748
202529.279.5%5,743

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN3Natural Gas Fired Combustion TurbineGT4.54.2May 2016Operating—coming soon
GEN1Natural Gas Fired Combustion TurbineGT0.80.8Aug 1983Retired May 2016—coming soon
GEN2Natural Gas Fired Combustion TurbineGT0.80.8Aug 1983Retired May 2016—coming soon

Owner / operator

Operator: Sharp Grossmont Hospital. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Sharp Grossmont Hospital100.0%5 MW

Nearby plants

Within 80 km.
El Cajon Energy Center61 MW3.7 km
North Johnson Energy Center50 MW3.7 km
Cuyamaca Peak Energy Plant49 MW3.7 km
Ventasso Energy Storage, LLC50 MW3.9 km
PFMG Solar Grossmont Helix LLC1 MW4 km
Grossmont College3 MW4.1 km