Cuyamaca Peak Energy Plant

San Diego County, California · EIA plant ID 55512 · Operator: San Diego Gas & Electric Co
Natural gasNatural Gas Fired Combustion TurbineCAISOBA: CISO
Nameplate49MWSummer 49 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor2%gas/coal/oil units, summer MW
Heat rate8,839Btu/kWhfossil units, electric fuel, HHV
First online2002Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh200220042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%200520102015202020252.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,00010,00012,000200520102015202020258,839 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20010——
200227.411.1%11,239
20037.72.1%11,308
200417.54.8%10,941
20059.22.5%11,020
20067.92.1%11,257
200730.27.1%11,066
2008122.8%10,927
200917.84.2%11,194
201013.83.2%12,769
201119.84.7%11,075
201246.510.9%11,161
201340.29.4%11,172
201423.45.5%11,251
201510.32.4%11,369
20168.21.9%11,541
20178.52.0%11,622
201814.93.5%11,456
201971.7%11,616
20206.81.6%11,556
20218.21.9%11,589
202212.63.0%11,507
202312.12.8%11,618
20245.91.4%11,573
20259.72.3%8,839

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CPP6Natural Gas Fired Combustion TurbineGT48.748.7May 2002Operating—coming soon

Owner / operator

Operator: San Diego Gas & Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
San Diego Gas & Electric Co100.0%49 MW

Nearby plants

Within 80 km.
North Johnson Energy Center50 MW0 km
El Cajon Energy Center61 MW0 km
Ventasso Energy Storage, LLC50 MW0.2 km
Grossmont HS Solar Project1 MW3.4 km
Grossmont Hospital5 MW3.7 km