← Back to map

Grossmont HS Solar Project

San Diego County, California · EIA plant ID 62987 · Operator: GSRP
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202616.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20191.714.5%—
20202.319.9%—
20212.219.3%—
20222.320.2%—
20232.118.3%—
20241.815.6%—
20251.916.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GHSPSolar PhotovoltaicPV1.41.3Dec 2018Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SunTrust Equipment Finance & Leasing Corp100.0%1 MW

Nearby plants

Within 80 km.
Grossmont College3 MW0.6 km
Cuyamaca Peak Energy Plant49 MW3.4 km
El Cajon Energy Center61 MW3.4 km
North Johnson Energy Center50 MW3.4 km
Ventasso Energy Storage, LLC50 MW3.5 km
Grossmont Hospital5 MW4.1 km