← Back to map

Kingbird A Solar LLC

Kern County, California · EIA plant ID 59868 · Operator: CD Arevon USA, Inc.
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation38GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202621.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201642.131.9%—
201759.433.9%—
201860.734.6%—
201957.432.8%—
202056.432.1%—
202159.233.8%—
202256.432.2%—
202356.232.1%—
202445.826.1%—
202538.221.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN01Solar PhotovoltaicPV2020Apr 2016Operating—coming soon

Owner / operator

Operator: CD Arevon USA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
8point3 Operating Company LLC70.0%14 MW
State Street Bank and Trust Company30.0%6 MW

Nearby plants

Within 80 km.
Kingbird B Solar, LLC20 MW0.8 km
Solar Star 1318 MW2.6 km
Solar Star 4—3.3 km
Solar Star 3—3.3 km
RE Astoria100 MW3.7 km
Rosamond South II—3.7 km