← Back to map

RE Astoria

Kern County, California · EIA plant ID 59976 · Operator: RE Astoria LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate100MWSummer 100 MW
Generators1in service
Net generation184GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%150%20162018202020222024202621.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2016103.3138.8%—
201727130.9%—
2018287.932.9%—
2019282.632.3%—
202028732.7%—
2021300.534.3%—
2022290.533.2%—
2023270.530.9%—
2024223.125.4%—
2025178.520.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ASTR1Solar PhotovoltaicPV100100Dec 2016Operating—coming soon

Owner / operator

Operator: RE Astoria LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RE Astoria LLC100.0%100 MW

Nearby plants

Within 80 km.
Solar Star 4—0.4 km
Solar Star 3—0.4 km
RE Astoria 275 MW2.2 km
Rosamond South II—2.6 km
Kingbird B Solar, LLC20 MW2.9 km
Kingbird A Solar LLC20 MW3.7 km