Solar Star 3Under construction

Kern County, California · EIA plant ID 68240 · Operator: Solar Star 3, LLC
SolarCAISOBA: CISO

47 MW under construction (Batteries, Solar Photovoltaic), first expected Oct 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 47 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SS3BTBatteriesBA2323planned Nov 2026Under construction—coming soon
SS3PVSolar PhotovoltaicPV2424planned Oct 2026Under construction—coming soon

Owner / operator

Operator: Solar Star 3, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Solar Star 4—0 km
RE Astoria100 MW0.4 km
RE Astoria 275 MW2.4 km
Kingbird B Solar, LLC20 MW2.5 km
Rosamond South II—2.5 km
Kingbird A Solar LLC20 MW3.3 km