Porterville Solar

Tulare County, California · EIA plant ID 58309 · Operator: Altus Power America Management, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate4MWSummer 4 MW
Generators3in service
Net generation6GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202619.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2014722.8%—
20157.123.2%—
2016722.7%—
20176.721.9%—
20186.721.9%—
20196.621.5%—
20206.621.4%—
20216.721.9%—
20226.220.3%—
2023619.6%—
20245.718.6%—
2025619.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV11Jan 2014Operating—coming soon
2Solar PhotovoltaicPV11Jan 2014Operating—coming soon
5Solar PhotovoltaicPV1.51.5Jan 2014Operating—coming soon

Owner / operator

Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Altus Power America Management, LLC100.0%4 MW

Nearby plants

Within 80 km.
Porterville 6 and 73 MW6.1 km
South County Detention Center Solar1 MW7.3 km
Solar Photovoltaic Project #425 MW8.9 km
Anode (Springville) BESS—8.9 km
Tulare Success Power Project1 MW11.5 km
Farmersville5 MW12.1 km