← Back to map

Farmersville

Tulare County, California · EIA plant ID 59203 · Operator: CD Arevon USA, Inc.
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate5MWSummer 5 MW
Generators3in service
Net generation6GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202614.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20143.215.9%—
20158.822.4%—
20168.822.3%—
20178.120.6%—
2018820.2%—
2019820.2%—
20207.719.5%—
20217.819.9%—
20225.714.5%—
20235.714.3%—
20246.516.6%—
20255.614.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV1.51.5Jul 2014Operating—coming soon
PV2Solar PhotovoltaicPV1.51.5Jul 2014Operating—coming soon
PV3Solar PhotovoltaicPV1.51.5Jul 2014Operating—coming soon

Owner / operator

Operator: CD Arevon USA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CD Arevon USA, Inc.100.0%5 MW

Nearby plants

Within 80 km.
Lindsay Solar4 MW2.7 km
Exeter Solar4 MW8.7 km
Porterville Solar4 MW12.1 km
Visalia CSG LLC3 MW16.9 km
South County Detention Center Solar1 MW17.6 km
Porterville 6 and 73 MW18 km