← Back to map

Solar Photovoltaic Project #42

Tulare County, California · EIA plant ID 57441 · Operator: Southern California Edison Co
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate5MWSummer 5 MW
Generators10in service
Net generation6GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2012201420162018202020222024202614.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20126.386.7%—
20139.421.4%—
20148.920.2%—
20159.321.2%—
20168.820.0%—
20178.118.6%—
20187.416.9%—
20198.218.6%—
20206.715.2%—
20218.118.5%—
20229.421.4%—
20236.915.8%—
20247.617.3%—
20256.414.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
S42ASolar PhotovoltaicPV0.50.5Nov 2012Operating—coming soon
S42BSolar PhotovoltaicPV0.50.5Nov 2012Operating—coming soon
S42CSolar PhotovoltaicPV0.50.5Nov 2012Operating—coming soon
S42DSolar PhotovoltaicPV0.50.5Nov 2012Operating—coming soon
S42ESolar PhotovoltaicPV0.50.5Nov 2012Operating—coming soon
S42FSolar PhotovoltaicPV0.50.5Nov 2012Operating—coming soon
S42GSolar PhotovoltaicPV0.50.5Nov 2012Operating—coming soon
S42HSolar PhotovoltaicPV0.50.5Nov 2012Operating—coming soon
S42ISolar PhotovoltaicPV0.50.5Nov 2012Operating—coming soon
S42JSolar PhotovoltaicPV0.50.5Nov 2012Operating—coming soon

Owner / operator

Operator: Southern California Edison Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Southern California Edison Co100.0%5 MW

Nearby plants

Within 80 km.
South County Detention Center Solar1 MW1.7 km
Porterville 6 and 73 MW5.5 km
Deer Creek Hybrid103 MW7 km
Porterville Solar4 MW8.9 km
Tulare Success Power Project1 MW14 km
Anode (Springville) BESS—15 km