Tulare Success Power Project

Tulare County, California · EIA plant ID 10222 · Operator: Lower Tule River Irrgtn Dist
HydroConventional HydroelectricCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor10%hydro units, summer MW
Heat rate—thermal plants only
First online1989

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202510.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200100.0%—
20021.411.0%—
20032.217.6%—
20040.54.1%—
20053.226.0%—
20063.528.6%—
20070.21.3%—
20080.86.5%—
20090.97.5%—
20102.419.9%—
20112.419.3%—
201217.9%—
20130.32.3%—
20140.10.5%—
201500.0%—
20160.65.0%—
20174.939.9%—
20180.54.0%—
20193.831.2%—
20200.43.6%—
202100.0%—
20220.54.4%—
202300.0%—
20241.613.4%—
20251.210.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SPP1Conventional HydroelectricHY1.41.4Dec 1989Operating (Standby / backup)—coming soon

Owner / operator

Operator: Lower Tule River Irrgtn Dist. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Lower Tule River Irrigation District57.0%1 MW
Porterville Irrigation District14.0%0 MW
Downstream Kaweah & Tule River Association11.0%0 MW
Pioneer Water Co9.0%0 MW
Vandalia Irrigation District9.0%0 MW

Nearby plants

Within 80 km.
Anode (Springville) BESS—5.7 km
Porterville 6 and 73 MW8.7 km
Porterville Solar4 MW11.5 km
South County Detention Center Solar1 MW12.5 km
Solar Photovoltaic Project #425 MW14 km
Lower Tule River3 MW14.9 km