Kingsburg Solar
Tulare County, California · EIA plant ID 58304 · Operator: Altus Power America Management, LLC
Nameplate4MWSummer 4 MW
Generators3in service
Net generation6GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2013
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2013 | 0.1 | 4.8% | — |
| 2014 | 7.5 | 23.2% | — |
| 2015 | 7.5 | 23.2% | — |
| 2016 | 7.5 | 23.1% | — |
| 2017 | 7.4 | 22.7% | — |
| 2018 | 7 | 21.7% | — |
| 2019 | 7.1 | 21.9% | — |
| 2020 | 6.7 | 20.6% | — |
| 2021 | 7.2 | 22.1% | — |
| 2022 | 6.4 | 19.8% | — |
| 2023 | 2.8 | 8.6% | — |
| 2024 | 6 | 18.6% | — |
| 2025 | 6.3 | 19.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | PV | 1.5 | 1.5 | Dec 2013 | Operating | — | coming soon |
| 2 | Solar Photovoltaic | PV | 1.5 | 1.5 | Dec 2013 | Operating | — | coming soon |
| 3 | Solar Photovoltaic | PV | 0.7 | 0.7 | Dec 2013 | Operating | — | coming soon |
Owner / operator
Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Altus Power America Management, LLC | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| Kingsburg Cogen | 36 MW | 5.2 km |
| Agriculture Capital - Legacy Packing | 2 MW | 6.7 km |
| Dover Dairy | 1 MW | 10.1 km |
| Dinuba Wastewater Treatment Plant | 1 MW | 10.8 km |
| FTF-PackingShed | 1 MW | 10.9 km |
| Moonlight Packing - Phase 2 | 1 MW | 10.9 km |