← Back to map

Dover Dairy

Kings County, California · EIA plant ID 65766 · Operator: renewable solar, inc
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh20232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2022202320242025202622.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2022231.0%—
20232.728.5%—
20252.122.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
13856Solar PhotovoltaicPV1.11.1May 2022Operating—coming soon

Owner / operator

Operator: renewable solar, inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Dover Dairy Farms100.0%1 MW

Nearby plants

Within 80 km.
Still Water Power1 MW3.2 km
Kingsburg Solar4 MW10.1 km
Agriculture Capital - Legacy Packing2 MW11.7 km
Double J Dairy Array4 MW12.8 km
Dixie Creek Dairy Solar3 MW13.8 km
Hanford 1 and 23 MW13.9 km