Hanford 1 and 2

Kings County, California · EIA plant ID 59300 · Operator: CD Arevon USA, Inc.
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators2in service
Net generation5GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202619.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20141.715.0%—
20156.123.0%—
2016622.9%—
20175.822.0%—
20185.621.1%—
20195.821.9%—
20205.721.6%—
20215.721.6%—
20225.521.1%—
20234.617.4%—
2024519.1%—
20255.219.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HAN1Solar PhotovoltaicPV1.51.5Aug 2014Operating—coming soon
HAN2Solar PhotovoltaicPV1.51.5Aug 2014Operating—coming soon

Owner / operator

Operator: CD Arevon USA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CD Arevon USA, Inc.100.0%3 MW

Nearby plants

Within 80 km.
Danell Bros Inc3 MW4.4 km
Hanford Energy Park Peaker92 MW4.4 km
Lead BESS 232 MW4.5 km
Lead BESS 199 MW4.5 km
River Ranch Dairy4 MW7.6 km
Lakeside Pipeline4 MW8 km