Kingsburg Cogen

Fresno County, California · EIA plant ID 10405 · Operator: KES Kingsburg LP
Natural gasNatural Gas Fired Combined CycleCAISOBA: CISO
Nameplate36MWSummer 34 MW
Generators2in service
Net generation4GWh12 mo to Dec 2025
Capacity factor1%gas/coal/oil units, summer MW
Heat rate10,610Btu/kWhfossil units, electric fuel, HHV
First online1990Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%200520102015202020251.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
9,5009,75010,00010,25010,5002005201020152020202510,610 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001134.1——
2002223.6——
200310334.8%10,224
2004152.451.3%9,937
2005114.138.5%9,937
2006107.536.3%9,833
200795.432.2%9,998
200895.532.2%10,443
2009109.537.0%9,903
201098.733.4%10,507
201190.230.5%10,204
20124615.5%9,937
2013299.8%10,254
201470.523.8%9,937
201555.718.8%9,979
2016268.8%10,334
201714.64.9%10,303
201851.7%10,246
20193.51.2%10,374
20203.31.1%10,233
202111.63.9%10,405
2022144.7%10,031
20234.61.6%10,097
202410.73.6%10,133
202541.4%10,610

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Natural Gas Fired Combined CycleCT23.122Dec 1990Operating—coming soon
GEN2Natural Gas Fired Combined CycleCA13.111.8Dec 1990Operating—coming soon

Owner / operator

Operator: KES Kingsburg LP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
KES Kingsburg LP100.0%36 MW

Nearby plants

Within 80 km.
Kingsburg Solar4 MW5.2 km
Moonlight Packing - Phase 21 MW11 km
Agriculture Capital - Legacy Packing2 MW11.2 km
National Raisin3 MW12.6 km
POM Plant 22 MW13.1 km
POM Plant 12 MW13.1 km