← Back to map

Horse Hollow Wind Energy Center

Taylor County, Texas · EIA plant ID 56291 · Operator: FPL Energy Horse Hollow LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate736MWSummer 736 MW
Generators3in service
Net generation2,486GWh12 mo to Aug 2026
Capacity factor39%wind units, summer MW
Heat rate—thermal plants only
First online2005

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300GWh20052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202538.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2005204.2128.8%—
20061,323.229.1%—
20071,85128.7%—
20082,027.231.4%—
20091,269.319.7%—
20101,845.128.6%—
20111,84628.6%—
20121,87929.1%—
20131,463.422.7%—
20142,309.135.8%—
20151,965.930.5%—
20162,159.633.4%—
20171,97330.6%—
20182,440.237.9%—
20192,493.538.7%—
20202,513.538.9%—
20212,31435.9%—
20222,336.236.3%—
20232,282.335.4%—
20242,458.138.0%—
20252,421.637.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT213213Dec 2005Operating—ge 1.5 SLE
2Onshore Wind TurbineWT223.5223.5Jun 2006Operating—siemens SWT-2.3-93
3Onshore Wind TurbineWT299299Jun 2006Operating—ge 1.5 SLE

Owner / operator

Operator: FPL Energy Horse Hollow LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
FPL Energy Horse Hollow LLC100.0%736 MW

Nearby plants

Within 80 km.
Buffalo Gap 3 Wind Farm170 MW9.1 km
Callahan Divide Wind Energy Center114 MW10.5 km
Buffalo Gap Wind Farm121 MW10.9 km
Holstein 1 Solar Farm200 MW15.7 km
Buffalo Gap 2 Wind Farm233 MW16.2 km
Holstein 2 Battery Storage—17.5 km