← Back to map

Buffalo Gap Wind Farm

Taylor County, Texas · EIA plant ID 56240 · Operator: AES Distributed Energy
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate121MWSummer 121 MW
Generators1in service
Net generation142GWh12 mo to Dec 2025
Capacity factor13%wind units, summer MW
Heat rate—thermal plants only
First online2006

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%201020152020202513.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200628435.7%—
2007338.332.0%—
2008346.632.7%—
2009237.622.5%—
2010355.133.6%—
2011393.137.2%—
201239136.9%—
2013374.235.4%—
2014385.136.4%—
2015324.830.8%—
2016349.533.0%—
201736234.3%—
201835333.4%—
2019358.433.9%—
2020330.431.2%—
2021290.527.5%—
2022219.220.8%—
2023198.518.8%—
202417916.9%—
2025141.913.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT120.6120.6Apr 2006Operating—vestas V80-1.8

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%121 MW

Nearby plants

Within 80 km.
Callahan Divide Wind Energy Center114 MW3.8 km
Buffalo Gap 3 Wind Farm170 MW4.5 km
Horse Hollow Wind Energy Center736 MW10.9 km
Buffalo Gap 2 Wind Farm233 MW10.9 km
South Trent Wind Farm101 MW12.4 km
Trent Wind Farm LP152 MW21 km