← Back to map

Callahan Divide Wind Energy Center

Taylor County, Texas · EIA plant ID 56270 · Operator: FPL Energy Callahan Wind, LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate114MWSummer 114 MW
Generators1in service
Net generation422GWh12 mo to Dec 2025
Capacity factor42%wind units, summer MW
Heat rate—thermal plants only
First online2005

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh20052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202542.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2005330.139.4%—
2006409.541.0%—
2007371.337.2%—
200840840.7%—
2009298.829.9%—
2010346.334.7%—
201136836.9%—
2012361.836.1%—
2013376.937.7%—
2014404.640.5%—
201533533.5%—
2016361.936.1%—
2017368.636.9%—
2018422.642.3%—
2019426.642.7%—
2020431.543.1%—
2021406.940.7%—
2022402.540.3%—
2023394.739.5%—
2024414.341.4%—
202542242.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT114114Mar 2005Operating—ge 1.5 SLE

Owner / operator

Operator: FPL Energy Callahan Wind, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
FPL Energy Callahan Wind, LLC100.0%114 MW

Nearby plants

Within 80 km.
Buffalo Gap Wind Farm121 MW3.8 km
Buffalo Gap 3 Wind Farm170 MW7.6 km
Horse Hollow Wind Energy Center736 MW10.5 km
Buffalo Gap 2 Wind Farm233 MW14.7 km
South Trent Wind Farm101 MW15.3 km
Chimney Rock BESS—18.7 km