← Back to map

Holstein 2 Battery StoragePlanned

Nolan County, Texas · EIA plant ID 67896 · Operator: 229HD 8me, LLC
BatteryERCOTBA: ERCO

100 MW planned (Batteries), first expected May 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
229HDBatteriesBA100100planned May 2029Planned—coming soon

Owner / operator

Operator: 229HD 8me, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Holstein 1 Solar Farm200 MW2.5 km
Hayrick BESS—14.2 km
Turkey Track Wind Energy LLC170 MW16.5 km
Horse Hollow Wind Energy Center736 MW17.5 km
Buffalo Gap 3 Wind Farm170 MW23.6 km
Mesquite Star419 MW24.6 km