← Back to map

Hayrick BESSPlanned

Coke County, Texas · EIA plant ID 67779 · Operator: Gransolar Texas Five LLC
BatteryERCOTBA: ERCO

114 MW planned (Batteries), first expected Mar 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GRS5BatteriesBA113.9113.9planned Mar 2028Planned—coming soon

Owner / operator

Operator: Gransolar Texas Five LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Holstein 2 Battery Storage—14.2 km
Holstein 1 Solar Farm200 MW15.2 km
Turkey Track Wind Energy LLC170 MW19.6 km
Mesquite Star419 MW26 km
Maryneal Windpower182 MW27.2 km
Sweetwater Wind 581 MW29.8 km