← Back to map

Sweetwater Wind 5

Nolan County, Texas · EIA plant ID 56372 · Operator: Leeward Asset Management, LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate81MWSummer 81 MW
Generators1in service
Net generation172GWh12 mo to Dec 2025
Capacity factor24%wind units, summer MW
Heat rate—thermal plants only
First online2007

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh2007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201020152020202524.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200712.520.8%—
200824334.4%—
2009220.531.3%—
2010228.432.4%—
2011241.534.3%—
2012238.533.7%—
2013238.533.8%—
2014249.535.4%—
2015206.129.2%—
2016238.333.7%—
2017229.932.6%—
2018215.630.6%—
2019217.930.9%—
2020194.827.5%—
2021172.724.5%—
2022168.123.8%—
2023165.223.4%—
2024163.223.1%—
2025172.524.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SW5Onshore Wind TurbineWT80.580.5Dec 2007Operating—siemens SWT-2.3-82 VS

Owner / operator

Operator: Leeward Asset Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Leeward Asset Management, LLC100.0%81 MW

Nearby plants

Within 80 km.
Maryneal Windpower182 MW4.3 km
Sweetwater Wind 3 LLC135 MW8.3 km
Sweetwater Wind 4 LLC241 MW9.5 km
Mesquite Star419 MW15.5 km
Sweetwater Wind 2 LLC99 MW16.2 km
Sweetwater Wind 1 LLC38 MW19.3 km