← Back to map

Sweetwater Wind 1 LLC

Nolan County, Texas · EIA plant ID 56211 · Operator: Leeward Asset Management, LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate38MWSummer 38 MW
Generators1in service
Net generation138GWh12 mo to Dec 2025
Capacity factor42%wind units, summer MW
Heat rate—thermal plants only
First online2003

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh20052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202542.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2005125.338.1%—
2006126.338.4%—
2007109.833.4%—
2008126.538.4%—
2009114.534.9%—
2010118.836.2%—
2011126.238.4%—
2012133.140.4%—
201311535.0%—
2014125.738.3%—
2015109.433.3%—
2016114.334.7%—
201797.329.6%—
2018141.743.1%—
2019150.345.8%—
2020145.444.1%—
2021139.142.3%—
2022142.543.4%—
2023137.641.9%—
2024140.842.8%—
2025138.242.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SW1Onshore Wind TurbineWT37.537.5Dec 2003Operating—ge 1.5 S

Owner / operator

Operator: Leeward Asset Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Leeward Asset Management, LLC100.0%38 MW

Nearby plants

Within 80 km.
Sweetwater Wind 2 LLC99 MW3.3 km
Sweetwater Wind 3 LLC135 MW11 km
Mesquite Star419 MW11.8 km
Trent Wind Farm LP152 MW12.4 km
Sweetwater BESS10 MW14.6 km
Buffalo Gap 2 Wind Farm233 MW15.9 km