← Back to map

Silver Creek

Jefferson Davis County, Mississippi · EIA plant ID 7988 · Operator: South Mississippi El Pwr Assn
Natural gasNatural Gas Fired Combustion TurbineMISOBA: MISO
Nameplate251MWSummer 225 MW
Generators3in service
Net generation282GWh12 mo to Dec 2025
Capacity factor14%gas/coal/oil units, summer MW
Heat rate12,393Btu/kWhfossil units, electric fuel, HHV
First online2003Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh20042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2005201020152020202514.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
12,00012,25012,50012,75013,0002005201020152020202512,393 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20042.20.2%12,856
200512.10.7%12,249
200618.30.9%12,136
200728.51.5%12,575
20081236.2%12,487
2009113.75.8%12,333
201038.72.0%12,467
2011163.68.3%12,266
201230.11.5%12,435
201367.93.5%12,335
201459.33.0%12,934
201590.24.6%12,694
201697.74.9%12,369
2017112.55.7%12,605
2018132.46.7%12,604
201945.62.3%12,587
202044.52.3%12,465
202175.33.8%12,513
202282.54.2%12,331
2023210.210.7%12,162
2024427.721.6%12,401
2025282.314.3%12,393

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combustion TurbineGT83.575Jun 2003Operating—coming soon
2Natural Gas Fired Combustion TurbineGT83.575Jun 2004Operating—coming soon
3Natural Gas Fired Combustion TurbineGT83.575Jun 2005Operating—coming soon

Owner / operator

Operator: South Mississippi El Pwr Assn. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
South Mississippi El Pwr Assn100.0%251 MW

Nearby plants

Within 80 km.
Georgia-Pacific Monticello Paper82 MW13.1 km
District 70 Transco Gas Pipe Line2 MW45.9 km
OE_MS4—47.3 km
Sumrall I Solar Farm52 MW47.9 km
Sumrall II Solar Farm52 MW49.2 km
Georgia-Pacific Taylorsville Plywood7 MW52.8 km