Georgia-Pacific Monticello Paper

Lawrence County, Mississippi · EIA plant ID 10610 · Operator: Georgia-Pacific Monticello LLC
OtherWood/Wood Waste BiomassMISOBA: MISO
Nameplate82MWSummer 82 MW
Generators2in service
Net generation517GWh12 mo to Dec 2025
Capacity factor48%other units, summer MW
Heat rate4,595Btu/kWhfossil units, electric fuel, HHV
First online1968

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh200120042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202548.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
05,00010,00015,000200520102015202020254,595 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001591.3116.3%15,491
200251.68.5%—
2004396.852.3%4,731
200541857.9%4,731
2006421.457.2%4,731
2007438.957.5%4,731
2008379.851.9%4,954
2009434.358.5%4,910
2010439.160.3%4,911
201146765.1%4,884
2012495.365.8%4,866
2013460.370.9%4,969
201441769.3%5,091
2015505.777.9%4,861
2016514.176.2%4,729
2017530.276.3%4,771
2018504.847.1%4,767
201948141.7%4,746
2020537.844.8%4,725
2021442.2—4,727
2022430.336.5%4,756
2023486.540.9%4,676
2024550.246.0%4,623
2025516.848.0%4,595

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Wood/Wood Waste BiomassST49.349.3Jun 1968Operating—coming soon
GEN2Wood/Wood Waste BiomassST32.232.2Jun 1968Operating—coming soon

Owner / operator

Operator: Georgia-Pacific Monticello LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Georgia-Pacific Monticello LLC100.0%82 MW

Nearby plants

Within 80 km.
Silver Creek251 MW13.1 km
District 70 Transco Gas Pipe Line2 MW43.8 km
OE_MS4—60.3 km
Sumrall I Solar Farm52 MW60.7 km
Sumrall II Solar Farm52 MW62 km
Georgia-Pacific Taylorsville Plywood7 MW62.8 km