← Back to map

OE_MS4Planned

Covington County, Mississippi · EIA plant ID 65293 · Operator: Origis Energy USA, Inc
SolarMISOBA: MISO

96 MW planned (Solar Photovoltaic), first expected Mar 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
OEMS4Solar PhotovoltaicPV9696planned Mar 2028Planned—coming soon

Owner / operator

Operator: Origis Energy USA, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Sumrall I Solar Farm52 MW4.2 km
Sumrall II Solar Farm52 MW4.7 km
Moselle511 MW20 km
Hattiesburg Solar Farm50 MW25.2 km
R D Morrow558 MW26 km
Georgia-Pacific Taylorsville Plywood7 MW44.3 km