← Back to map

Hattiesburg Solar Farm

Forrest County, Mississippi · EIA plant ID 60552 · Operator: Hattiesburg Farm, LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate50MWSummer 50 MW
Generators1in service
Net generation89GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202620.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201713.111.9%—
201890.320.6%—
201991.720.9%—
202088.620.2%—
202188.520.2%—
202296.822.1%—
202384.219.2%—
202493.121.2%—
202587.820.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HATTISolar PhotovoltaicPV5050Oct 2017Operating—coming soon

Owner / operator

Operator: Hattiesburg Farm, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hattiesburg Farm, LLC100.0%50 MW

Nearby plants

Within 80 km.
R D Morrow558 MW10.9 km
Sumrall II Solar Farm52 MW22.1 km
Sumrall I Solar Farm52 MW23.4 km
Leaf River Cellulose LLC50 MW24.6 km
OE_MS4—25.2 km
Moselle511 MW28 km