E B Harris Electric Generating Plant

Autauga County, Alabama · EIA plant ID 7897 · Operator: Southern Power Co
Natural gasNatural Gas Fired Combined CycleBA: SOCO
Nameplate1,304MWSummer 1,315 MW
Generators6in service
Net generation4,966GWh12 mo to Aug 2026
Capacity factor43%gas/coal/oil units, summer MW
Heat rate7,109Btu/kWhfossil units, electric fuel, HHV
First online2003Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2000200400600800GWh200420062008201020122014201620182020202220242026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202543.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,8007,0007,200200520102015202020257,109 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20031,045.619.7%7,153
20042,201.422.4%7,299
20051,777.516.2%7,350
20062,433.522.2%7,204
20073,352.930.5%7,205
20082,698.824.5%7,200
20093,293.129.9%7,183
20104,189.337.7%7,219
20115,557.350.0%7,131
20126,479.858.1%7,117
20134,629.141.6%7,191
20144,790.543.1%7,333
20157,433.366.6%7,150
20166,096.954.4%7,108
20175,302.247.4%7,093
20185,865.450.9%7,033
20194,404.438.2%7,042
20204,418.238.3%7,030
20214,700.640.8%7,080
20226,762.158.7%7,059
20236,460.556.1%7,003
20244,979.843.1%7,057
20255,071.144.0%7,047

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CT1ANatural Gas Fired Combined CycleCT185182.6Jun 2003Operating—coming soon
CT1BNatural Gas Fired Combined CycleCT185182.6Jun 2003Operating—coming soon
CT2ANatural Gas Fired Combined CycleCT185178.3Jun 2003Operating—coming soon
CT2BNatural Gas Fired Combined CycleCT185178.3Jun 2003Operating—coming soon
ST1Natural Gas Fired Combined CycleCA282293Jun 2003Operating—coming soon
ST2Natural Gas Fired Combined CycleCA282300Jun 2003Operating—coming soon
1——615615planned Jun 2003not_current—coming soon
2——615615planned Jun 2004not_current—coming soon
ST1A—CA282282planned Jun 2003not_current—coming soon
ST1B—CA182182planned Jun 2003not_current—coming soon

Owner / operator

Operator: Southern Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Southern Power Co100.0%1,304 MW

Nearby plants

Within 80 km.
General Electric Plastic97 MW9.1 km
International Paper Prattville Mill90 MW10.5 km
Old Hayneville Solar, LLC80 MW16.9 km
Jones Bluff82 MW20.7 km
SR Hope Hull—27.7 km
International Paper Riverdale Mill104 MW28.3 km