← Back to map

International Paper Prattville Mill

Autauga County, Alabama · EIA plant ID 52140 · Operator: International Paper Co
OtherWood/Wood Waste BiomassBA: SOCO
Nameplate90MWSummer 85 MW
Generators2in service
Net generation536GWh12 mo to Aug 2026
Capacity factor56%other units, summer MW
Heat rate4,674Btu/kWhfossil units, electric fuel, HHV
First online1967

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh200120032007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202556.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
2,0004,0006,0008,00010,000200520102015202020254,674 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001519.268.8%8,929
2002467.447.9%9,121
2003411.747.3%10,530
200540.74.2%5,466
2006515.254.4%5,466
2007483.161.7%5,466
2008503.659.8%5,092
2009507.856.0%5,092
2010559.770.9%5,092
2011565.571.0%5,350
2012544.260.8%5,466
2013546.963.3%5,466
2014544.867.2%5,466
2015578.365.6%5,092
2016573.763.6%4,431
2017583.563.4%4,431
201855961.5%4,431
2019595.860.9%4,431
2020629.763.6%4,431
2021568.155.3%4,431
2022538.653.6%4,431
2023610.761.0%4,453
202457357.8%4,431
2025558.958.7%4,536

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Wood/Wood Waste BiomassST40.537Feb 1967Operating—coming soon
GEN2Wood/Wood Waste BiomassST49.348May 1980Operating—coming soon

Owner / operator

Operator: International Paper Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
International Paper Co100.0%90 MW

Nearby plants

Within 80 km.
E B Harris Electric Generating Plant1,304 MW10.5 km
Old Hayneville Solar, LLC80 MW12.6 km
General Electric Plastic97 MW13.1 km
SR Hope Hull—23.1 km
Walter Bouldin Dam225 MW25.5 km
Black Bear Solar 1100 MW28.1 km