1515 S Caron RoadRetired

Ogle County, Illinois · EIA plant ID 7770 · Operator: Rochelle Municipal Utilities
Natural gasPJMBA: PJM

×4 MW natural gas retired since 2020 (latest Mar 2022)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh20022004200620082010201220142016201820202022

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%2005201020152020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,0002005201020152020
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200239.9%11,114
20031.55.1%11,948
20040.41.3%14,183
20050.31.1%20,169
20060.20.6%14,119
20070.10.3%—
20080.10.3%13,250
20090.20.6%13,232
20100.31.2%13,135
20110.20.6%15,833
20120.20.7%13,317
20130.20.8%12,177
20140.20.7%13,365
20150.31.0%—
20160.31.2%13,373
20170.31.0%13,932
20180.31.0%14,382
201900.1%16,417
20200.20.6%16,281
20210.20.8%19,010
202200.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GT1Natural Gas Fired Combustion TurbineGT4.23May 2000Retired Mar 2022—coming soon

Owner / operator

Operator: Rochelle Municipal Utilities. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
IL Rochelle 975 S. Caron Rd2 MW0.2 km
North Ninth Street17 MW0.3 km
South Main Street16 MW0.3 km
Rochelle Energy Center5 MW4.4 km
Steward Creek Solar Phase 1—11.5 km
Tower Road Solar, LLC CSG2 MW15.3 km