← Back to map

Steward Creek Solar Phase 1Planned

Lee County, Illinois · EIA plant ID 65301 · Operator: TerraForm Power Operating, LLC
SolarPJMBA: PJM

1,200 MW planned (Solar Photovoltaic), first expected Dec 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SC1Solar PhotovoltaicPV1,2001,200planned Dec 2029Planned—coming soon

Owner / operator

Operator: TerraForm Power Operating, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Tower Road Solar, LLC CSG2 MW5.5 km
Boigenzahn Solar 1A, LLC2 MW6.1 km
FPL Energy Illinois Wind LLC Hybrid238 MW10 km
1515 S Caron Roadretired11.5 km
IL Rochelle 975 S. Caron Rd2 MW11.5 km
Mendota Hills, LLC76 MW11.6 km