← Back to map

Godwin Drive Plant

Prince William County, Virginia · EIA plant ID 7439 · Operator: City of Manassas - (VA)
OilPetroleum LiquidsPJMBA: PJM
Nameplate6MWSummer 6 MW
Generators4in service
Net generation0GWh12 mo to Dec 2025
Capacity factor1%gas/coal/oil units, summer MW
Heat rate15,111Btu/kWhfossil units, electric fuel, HHV
First online1990Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%2%200520102015202020250.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
05,00010,00015,0002005201020152020202515,111 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20010.91.7%9,606
20021.12.1%9,548
200312.0%9,621
20041.22.3%9,541
20051.12.1%9,544
20060.91.7%9,589
20070.81.6%9,580
20080.61.2%8,993
20090.40.8%9,659
20100.10.2%17,449
20110.10.1%11,667
20120.10.1%11,912
20130.10.2%11,773
201400.1%11,629
20150.20.4%10,105
20160.10.1%11,235
20170.10.2%9,869
20180.10.2%10,344
20190.30.5%7,605
20200.50.9%4,924
20210.61.1%10,298
20220.61.1%9,591
20230.40.8%17,465
20240.40.8%10,245
20250.40.8%15,111

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
C10Petroleum LiquidsIC1.51.5Nov 1992Operating—coming soon
C7Petroleum LiquidsIC1.61.5May 1990Operating—coming soon
C8Petroleum LiquidsIC1.61.5May 1990Operating—coming soon
C9Petroleum LiquidsIC1.61.5Nov 1992Operating—coming soon

Owner / operator

Operator: City of Manassas - (VA). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Manassas - (VA)100.0%6 MW

Nearby plants

Within 80 km.
VMEA Peaking Gen6 MW0 km
VMEA 1 Credit Gen13 MW0 km
Dominion/Lo Mar19 MW1 km
Gateway Gen4 MW1.7 km
Church Street Plant4 MW4.1 km
Railroad Energy Center, LLC—5.4 km