← Back to map

Shelbina Power #2

Shelby County, Missouri · EIA plant ID 7406 · Operator: City of Shelbina - (MO)
OilPetroleum LiquidsBA: AECI
Nameplate7MWSummer 7 MW
Generators4in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate11,023Btu/kWhfossil units, electric fuel, HHV
First online1992Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040MWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%0%1%200520102015202020250.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,00010,00012,00014,0002005201020152020202511,023 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20010.20.4%12,240
200200.0%13,993
20030.10.2%10,291
200400.0%13,095
20050.30.6%12,893
20060.20.4%10,605
20070.10.1%10,950
200800.0%—
20090.20.3%10,689
201000.1%12,812
20110.10.1%10,567
201200.1%11,185
201300.1%11,187
20140.10.1%10,590
201500.1%10,853
201600.1%11,143
20170.10.1%10,397
201800.1%10,763
201900.0%10,200
20200.10.1%10,589
20210.30.5%10,007
20220.10.1%10,545
202300.1%10,613
20240.10.1%10,534
202500.1%11,023

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
G3Petroleum LiquidsIC1.61.6Apr 1992Operating—coming soon
G4Petroleum LiquidsIC1.61.6Apr 1992Operating—coming soon
G5Petroleum LiquidsIC1.61.6Apr 1992Operating—coming soon
G6Petroleum LiquidsIC1.81.8Jul 1999Operating—coming soon

Owner / operator

Operator: City of Shelbina - (MO). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Shelbina - (MO)100.0%7 MW

Nearby plants

Within 80 km.
Shelbina Power #15 MW0 km
Shelbina Power #34 MW0.7 km
Monroe (MO)retired27.3 km
Macon Energy Center10 MW29.5 km
Sub 3 Generating Stationretired35.6 km
Macon Solar Power Project3 MW36.1 km