Macon Solar Power Project

Macon County, Missouri · EIA plant ID 59729 · Operator: Missouri Jnt Muni.Pwr Elec. Ut. Comm.
SolarSolar PhotovoltaicSPPBA: SWPP
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Aug 2026
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2015

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh20162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202616.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20152.819.8%—
20164.418.0%—
20174.317.6%—
20184.116.7%—
20193.916.0%—
20203.915.8%—
20213.815.6%—
20223.715.0%—
20234.317.7%—
20244.217.1%—
2025416.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MSF1Solar PhotovoltaicPV2.82.8Jun 2015Operating—coming soon

Owner / operator

Operator: Missouri Jnt Muni.Pwr Elec. Ut. Comm.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MPUA100.0%3 MW

Nearby plants

Within 80 km.
Sub 3 Generating Stationretired0.6 km
Macon1 MW2.6 km
Sub 2 Generating Stationretired3.6 km
Macon Energy Center10 MW6.6 km
Thomas Hill1,182 MW27.7 km
La Plata4 MW29.5 km