← Back to map

Sub 2 Generating StationRetired

Macon County, Missouri · EIA plant ID 56126 · Operator: City of Macon - (MO)
OilBA: AECI

×4 MW oil retired since 2020 (latest May 2023)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030MWh20032005200720092011201320152017201920212023

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%0%1%2005201020152020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,50010,00012,50015,000200420062008201020122014
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20030.3—12,437
20040.10.2%9,870
20050.20.7%10,724
20060.10.3%10,411
20070.10.3%9,476
200800.1%16,467
20090.10.2%10,508
201000.1%11,200
201100.1%10,000
201200.1%11,938
201300.0%12,000
201400.0%—
201500.0%—
201600.0%—
201700.0%—
201800.0%—
201900.0%—
202000.0%—
202100.0%—
202200.0%—
202300.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsIC1.81.8Jan 2004Retired May 2023—coming soon
2Petroleum LiquidsIC1.81.8Jan 2004Retired May 2023—coming soon

Owner / operator

Operator: City of Macon - (MO). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Macon1 MW3 km
Macon Solar Power Project3 MW3.6 km
Sub 3 Generating Stationretired4.2 km
Macon Energy Center10 MW9.9 km
Thomas Hill1,182 MW25 km
La Plata4 MW30.5 km