Midulla Generating Station
Hardee County, Florida · EIA plant ID 7380 · Operator: Seminole Electric Cooperative Inc
Nameplate853MWSummer 786 MW
Generators8in service
Net generation3,297GWh12 mo to Aug 2026
Capacity factor30%gas/coal/oil units, summer MW
Heat rate7,009Btu/kWhfossil units, electric fuel, HHV
First online2002Runs as intermediate
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2002 | 2,425 | — | — |
| 2003 | 2,269.6 | 53.1% | 7,588 |
| 2004 | 2,102.4 | 49.0% | 7,379 |
| 2005 | 1,873.1 | 43.8% | 7,353 |
| 2006 | 2,109.3 | 47.1% | 7,760 |
| 2007 | 717.5 | 10.8% | 10,139 |
| 2008 | 1,566.3 | 23.5% | 7,916 |
| 2009 | 2,901 | 43.7% | 8,091 |
| 2010 | 2,820 | 42.7% | 8,166 |
| 2011 | 2,512.2 | 39.6% | 8,047 |
| 2012 | 2,795.4 | 43.0% | 8,063 |
| 2013 | 2,863 | 43.5% | 7,850 |
| 2014 | 2,508.7 | 38.1% | 7,675 |
| 2015 | 2,494.2 | 37.9% | 7,578 |
| 2016 | 3,275.4 | 49.6% | 7,589 |
| 2017 | 3,319.6 | 49.9% | 7,723 |
| 2018 | 3,637.1 | 54.7% | 7,582 |
| 2019 | 3,749.1 | 52.4% | 7,285 |
| 2020 | 4,402.7 | 61.7% | 7,129 |
| 2021 | 4,193.3 | 58.9% | 7,161 |
| 2022 | 3,757.7 | 52.8% | 7,373 |
| 2023 | 2,682 | 39.0% | 7,406 |
| 2024 | 2,884.5 | 41.8% | 7,121 |
| 2025 | 3,537.3 | 51.4% | 7,134 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo19,603 MMBtu
Last month with liquid burnApr 2026
Switch while operatingYes
Net summer MW on gas780
Net summer MW on oil739
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 6 h (EIA 6H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CT1 | Natural Gas Fired Combined Cycle | CT | 181.1 | 179 | Jan 2002 | Operating | — | coming soon |
| CT2 | Natural Gas Fired Combined Cycle | CT | 181.1 | 179 | Jan 2002 | Operating | — | coming soon |
| GT4 | Natural Gas Fired Combustion Turbine | GT | 62 | 54 | Dec 2006 | Operating | — | coming soon |
| GT5 | Natural Gas Fired Combustion Turbine | GT | 62 | 54 | Dec 2006 | Operating | — | coming soon |
| GT6 | Natural Gas Fired Combustion Turbine | GT | 62 | 54 | Dec 2006 | Operating | — | coming soon |
| GT7 | Natural Gas Fired Combustion Turbine | GT | 62 | 54 | Dec 2006 | Operating | — | coming soon |
| GT8 | Natural Gas Fired Combustion Turbine | GT | 62 | 27 | Dec 2006 | Operating | — | coming soon |
| ST3 | Natural Gas Fired Combined Cycle | CA | 181.1 | 185 | Jan 2002 | Operating | — | coming soon |
| CT1A | — | CT | 199 | 157 | Jan 2002 | not_current | — | coming soon |
| CT1B | — | CT | 199 | 157 | Jan 2002 | not_current | — | coming soon |
| GT-A | Natural Gas Fired Combustion Turbine | GT | 62 | 54 | planned Nov 2006 | not_current | — | coming soon |
| GT-B | Natural Gas Fired Combustion Turbine | GT | 62 | 54 | planned Nov 2006 | not_current | — | coming soon |
| GT-C | Natural Gas Fired Combustion Turbine | GT | 62 | 54 | planned Nov 2006 | not_current | — | coming soon |
| GT-D | Natural Gas Fired Combustion Turbine | GT | 62 | 54 | planned Nov 2006 | not_current | — | coming soon |
| GT-E | Natural Gas Fired Combustion Turbine | GT | 62 | 54 | planned Nov 2006 | not_current | — | coming soon |
| ST1 | — | CA | 189 | 174 | Jan 2002 | not_current | — | coming soon |
Owner / operator
Operator: Seminole Electric Cooperative Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Seminole Electric Cooperative Inc | 100.0% | 853 MW |
Nearby plants
Within 80 km.
| Hardee Power Station | 470 MW | 0.6 km |
| Fort Green Solar Power Plant | 75 MW | 2.1 km |
| Payne Creek Solar | 70 MW | 2.6 km |
| Alafia Solar | 60 MW | 9.6 km |
| Polk | 1,458 MW | 10 km |
| Lake Hancock Solar | 50 MW | 11.1 km |