Woodland
Stanislaus County, California · EIA plant ID 7266 · Operator: Modesto Irrigation District
Nameplate199MWSummer 177 MW
Generators9in service
Net generation289GWh12 mo to Aug 2026
Capacity factor19%gas/coal/oil units, summer MW
Heat rate9,890Btu/kWhfossil units, electric fuel, HHV
First online1993Runs as peaking
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 243.2 | — | — |
| 2002 | 130.2 | — | — |
| 2003 | 305.8 | 35.7% | 8,975 |
| 2004 | 323.6 | 27.7% | 8,722 |
| 2005 | 363.7 | 31.2% | 8,869 |
| 2006 | 370 | 31.8% | 9,055 |
| 2007 | 378.1 | 32.5% | 8,917 |
| 2008 | 416.4 | 35.6% | 8,782 |
| 2009 | 374.6 | 32.1% | 8,721 |
| 2010 | 363.5 | 31.2% | 8,499 |
| 2011 | 404.5 | 29.3% | 8,825 |
| 2012 | 466.1 | 29.1% | 8,751 |
| 2013 | 494.8 | 31.0% | 8,875 |
| 2014 | 897.8 | 56.3% | 8,703 |
| 2016 | 490.4 | 30.6% | 7,693 |
| 2017 | 429.3 | 26.9% | 8,346 |
| 2018 | 515 | 33.2% | 8,096 |
| 2019 | 490 | 31.6% | 7,955 |
| 2020 | 467.6 | 30.0% | 8,265 |
| 2021 | 356.6 | 23.0% | 8,932 |
| 2022 | 319.6 | 20.6% | 9,379 |
| 2023 | 305.8 | 19.7% | 9,090 |
| 2024 | 271.9 | 17.5% | 10,153 |
| 2025 | 281.6 | 18.1% | 9,901 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 2 | Natural Gas Fired Combined Cycle | CA | 37.7 | 33 | Jun 2003 | Operating | — | coming soon |
| 3 | Natural Gas Fired Combined Cycle | CT | 60.5 | 50 | Jun 2003 | Operating | — | coming soon |
| 3A | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.2 | Jul 2011 | Operating | — | coming soon |
| 3B | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.2 | Jul 2011 | Operating | — | coming soon |
| 3C | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.2 | Jul 2011 | Operating | — | coming soon |
| 3D | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.2 | Jul 2011 | Operating | — | coming soon |
| 3E | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.2 | Jul 2011 | Operating | — | coming soon |
| 3F | Natural Gas Internal Combustion Engine | IC | 8.4 | 8.2 | Jul 2011 | Operating | — | coming soon |
| NA1 | Natural Gas Fired Combustion Turbine | GT | 50.4 | 45 | Nov 1993 | Operating | — | coming soon |
| 1 | — | — | 80 | 80 | planned Jun 2003 | not_current | — | coming soon |
Owner / operator
Operator: Modesto Irrigation District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Modesto Irrigation District | 100.0% | 199 MW |
Nearby plants
Within 80 km.
| Aurora Renewable Energy (Hybrid) | — | 5.2 km |
| ERock MID Claribel Generation Station | 48 MW | 7.9 km |
| McClure | 142 MW | 8.3 km |
| Almond Power Plant | 224 MW | 9.2 km |
| Axium Modesto Solar | 25 MW | 9.3 km |
| Ripon Generation Station | 121 MW | 12.2 km |