Woodland

Stanislaus County, California · EIA plant ID 7266 · Operator: Modesto Irrigation District
Natural gasNatural Gas Fired Combined CycleNatural Gas Fired Combustion TurbineNatural Gas Internal Combustion EngineCAISOBA: BANC
Nameplate199MWSummer 177 MW
Generators9in service
Net generation289GWh12 mo to Aug 2026
Capacity factor19%gas/coal/oil units, summer MW
Heat rate9,890Btu/kWhfossil units, electric fuel, HHV
First online1993Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-20020406080GWh2001200320052007200920112013201620182020202220242026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202518.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,0008,0009,00010,000200520102015202020259,890 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001243.2——
2002130.2——
2003305.835.7%8,975
2004323.627.7%8,722
2005363.731.2%8,869
200637031.8%9,055
2007378.132.5%8,917
2008416.435.6%8,782
2009374.632.1%8,721
2010363.531.2%8,499
2011404.529.3%8,825
2012466.129.1%8,751
2013494.831.0%8,875
2014897.856.3%8,703
2016490.430.6%7,693
2017429.326.9%8,346
201851533.2%8,096
201949031.6%7,955
2020467.630.0%8,265
2021356.623.0%8,932
2022319.620.6%9,379
2023305.819.7%9,090
2024271.917.5%10,153
2025281.618.1%9,901

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2Natural Gas Fired Combined CycleCA37.733Jun 2003Operating—coming soon
3Natural Gas Fired Combined CycleCT60.550Jun 2003Operating—coming soon
3ANatural Gas Internal Combustion EngineIC8.48.2Jul 2011Operating—coming soon
3BNatural Gas Internal Combustion EngineIC8.48.2Jul 2011Operating—coming soon
3CNatural Gas Internal Combustion EngineIC8.48.2Jul 2011Operating—coming soon
3DNatural Gas Internal Combustion EngineIC8.48.2Jul 2011Operating—coming soon
3ENatural Gas Internal Combustion EngineIC8.48.2Jul 2011Operating—coming soon
3FNatural Gas Internal Combustion EngineIC8.48.2Jul 2011Operating—coming soon
NA1Natural Gas Fired Combustion TurbineGT50.445Nov 1993Operating—coming soon
1——8080planned Jun 2003not_current—coming soon

Owner / operator

Operator: Modesto Irrigation District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Modesto Irrigation District100.0%199 MW

Nearby plants

Within 80 km.
Aurora Renewable Energy (Hybrid)—5.2 km
ERock MID Claribel Generation Station48 MW7.9 km
McClure142 MW8.3 km
Almond Power Plant224 MW9.2 km
Axium Modesto Solar25 MW9.3 km
Ripon Generation Station121 MW12.2 km