Natural gasNatural Gas Fired Combustion TurbineCAISOBA: BANC
Nameplate121MWSummer 100 MW
Generators2in service
Net generation3GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate17,867Btu/kWhfossil units, electric fuel, HHV
First online2006Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh2007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%20102015202020250.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,00010,00015,000201020152020202517,867 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200661.2%12,737
200727.13.2%12,494
2008333.9%12,437
200942.55.1%11,495
2010222.6%11,817
201136.34.3%11,549
201226.43.1%11,679
201320.52.4%10,227
201432.23.8%8,546
201522.52.7%11,519
201669.28.2%10,529
201784.910.1%10,927
201824.82.8%11,551
201912.21.4%12,495
202015.71.8%12,401
202130.93.5%11,611
202219.72.2%11,791
20239.71.1%13,263
20248.71.0%13,361
20252.80.3%17,867

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combustion TurbineGT60.550Jun 2006Operating—coming soon
2Natural Gas Fired Combustion TurbineGT60.550Jun 2006Operating—coming soon

Owner / operator

Operator: Modesto Irrigation District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Modesto Irrigation District100.0%121 MW

Nearby plants

Within 80 km.
Ripon Mill50 MW0.1 km
Noosa Energy Storage LLC—3.9 km
Tesoro RV & Boat Storage3 MW8 km
CA Manteca 730 Spreckels Ave3 MW9.4 km
Axium Modesto Solar25 MW10.6 km