Almond Power Plant

Stanislaus County, California · EIA plant ID 7315 · Operator: Turlock Irrigation District
Natural gasNatural Gas Fired Combustion TurbineCAISOBA: TIDC
Nameplate224MWSummer 200 MW
Generators4in service
Net generation152GWh12 mo to Aug 2026
Capacity factor9%gas/coal/oil units, summer MW
Heat rate11,289Btu/kWhfossil units, electric fuel, HHV
First online1996Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-20020406080GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%200520102015202020258.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,0008,0009,00010,00011,0002005201020152020202511,289 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001283.565.4%8,155
2002124.628.7%9,628
200330.47.0%10,258
20045512.6%10,230
2005107.924.9%10,279
2006121.828.1%10,746
200782.619.1%10,862
20086214.2%11,079
20096013.8%10,874
201045.510.5%11,036
201179.118.2%10,883
2012135.412.3%10,853
2013161.19.2%10,607
2014217.612.4%10,755
2015196.911.3%10,776
2016111.96.4%10,899
2017182.110.4%10,709
2018169.89.7%10,672
201928216.1%10,846
2020248.514.2%10,622
2021409.323.4%10,643
2022290.116.6%10,757
2023188.410.8%10,708
20241739.9%10,903
2025133.27.6%10,971

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combustion TurbineGT49.549.5Apr 1996Operating—coming soon
2Natural Gas Fired Combustion TurbineGT5850Jul 2012Operating—coming soon
3Natural Gas Fired Combustion TurbineGT5850Jul 2012Operating—coming soon
4Natural Gas Fired Combustion TurbineGT5850Jul 2012Operating—coming soon

Owner / operator

Operator: Turlock Irrigation District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Turlock Irrigation District100.0%224 MW

Nearby plants

Within 80 km.
McClure142 MW7.7 km
Woodland199 MW9.2 km
Aurora Renewable Energy (Hybrid)—9.7 km
Walnut50 MW11.7 km
Walnut Energy Center301 MW12.4 km
ERock MID Claribel Generation Station48 MW15.2 km