Highland Solar I, LLC - (CO)Planned
Pueblo County, Colorado · EIA plant ID 70583 · Operator: Highland Solar I, LLC
400 MW planned (Batteries, Solar Photovoltaic), first expected Dec 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| HES01 | Batteries | BA | 100 | 100 | planned Dec 2027 | Planned | — | coming soon |
| HLS01 | Solar Photovoltaic | PV | 300 | 300 | planned Dec 2027 | Planned | — | coming soon |
Owner / operator
Operator: Highland Solar I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Neptune Energy Center Hybrid | 450 MW | 19 km |
| Pueblo Airport Generating Station | 440 MW | 28.3 km |
| Trane Pueblo | 1 MW | 29.5 km |
| Thunder Wolf Energy Center Hybrid | 348 MW | 29.5 km |
| CEC Solar #1117, LLC | 2 MW | 29.9 km |
| Airport Industrial | 10 MW | 30.4 km |