← Back to map

Turnpike Solar PlantUnder construction

Osceola County, Florida · EIA plant ID 70223 · Operator: Duke Energy Florida, Inc
SolarBA: FPC

75 MW under construction (Solar Photovoltaic), first expected Feb 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 75 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TPSP1Solar PhotovoltaicPV74.974.9planned Feb 2027Under construction—coming soon

Owner / operator

Operator: Duke Energy Florida, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Osceola Solar Facility4 MW1.9 km
Lonesome Camp Solar Plant—2.4 km
JED Solid Waste Mgmt Renewable Energy10 MW12.3 km
Osceola580 MW14.3 km
Harmony Solar75 MW15.2 km
Harmony Florida Solar II75 MW17.8 km