JED Solid Waste Mgmt Renewable Energy

Osceola County, Florida · EIA plant ID 60701 · Operator: sims energy
OtherLandfill GasBA: FPC
Nameplate10MWSummer 8 MW
Generators6in service
Net generation37GWh12 mo to Dec 2025
Capacity factor50%other units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh2018201920202021202220232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2018202020222024202650.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201755.690.2%—
201855.775.7%—
201937.951.5%—
202033.845.8%—
202149.567.2%—
202241.656.5%—
202340.655.2%—
202537.150.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
603Landfill GasIC1.61.4Mar 2017Operating—coming soon
696Landfill GasIC1.61.4Mar 2017Operating—coming soon
697Landfill GasIC1.61.4Mar 2017Operating—coming soon
698Landfill GasIC1.61.4Mar 2017Operating—coming soon
699Landfill GasIC1.61.4Mar 2017Operating—coming soon
700Landfill GasIC1.61.4Mar 2017Operating—coming soon

Owner / operator

Operator: sims energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
sims energy100.0%10 MW

Nearby plants

Within 80 km.
Osceola580 MW7.2 km
Harmony Solar75 MW10.2 km
Harmony Florida Solar II75 MW11.6 km
Turnpike Solar Plant—12.3 km
Lonesome Camp Solar Plant—14.1 km
Osceola Solar Facility4 MW14.2 km