Cabokenze Energy StoragePlanned
Burke County, Georgia · EIA plant ID 69823 · Operator: Cabokenze Energy Storage, LLC
76 MW planned (Batteries), first expected Nov 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CABOK | Batteries | BA | 76 | 76 | planned Nov 2027 | Planned | — | coming soon |
Owner / operator
Operator: Cabokenze Energy Storage, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| White Oak Solar, LLC | 77 MW | 0.7 km |
| Bird Dog Solar | 40 MW | 14.9 km |
| Shawnee - GA | 2 MW | 15.1 km |
| Hobnail Solar | 70 MW | 25.5 km |
| Old Midville Solar | 20 MW | 27.3 km |
| Waynesboro Community Solar | 2 MW | 31.2 km |