← Back to map

Hobnail Solar

Burke County, Georgia · EIA plant ID 66026 · Operator: Hobnail Solar, LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate70MWSummer 70 MW
Generators1in service
Net generation164GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202726.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20231.22.3%—
2024149.924.4%—
2025163.426.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GA-03Solar PhotovoltaicPV7070Dec 2023Operating—coming soon

Owner / operator

Operator: Hobnail Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hobnail Solar, LLC100.0%70 MW

Nearby plants

Within 80 km.
Richmond County GA S2 LLC3 MW10.8 km
Apalachicola3 MW13.7 km
Fort Gordon Solar Facility30 MW14.3 km
Richmond Hayes Solar2 MW18.4 km
Columbia Bryson1 MW18.7 km
International Paper Augusta Mill85 MW22.2 km