Wyre Wynd Hydroelectric Project
New London County, Connecticut · EIA plant ID 69673 · Operator: Elevate Power Management LLC
Nameplate3MWSummer 3 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online1984
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Conventional Hydroelectric | HY | 2.7 | 2.7 | May 1984 | Operating | — | coming soon |
| GEN2 | Conventional Hydroelectric | HY | 0.1 | 0.1 | May 1984 | Operating | — | coming soon |
Owner / operator
Operator: Elevate Power Management LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Elevate Power Management LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Jewett City 1 | 3 MW | 0.6 km |
| Fusion Solar Center LLC | 20 MW | 5.1 km |
| Plainfield Solar One | — | 5.4 km |
| Wheelabrator Lisbon | 15 MW | 5.4 km |
| Taftville | 2 MW | 6.5 km |
| Jackson Solar (CT) | 1 MW | 7.3 km |