← Back to map

Wyre Wynd Hydroelectric Project

New London County, Connecticut · EIA plant ID 69673 · Operator: Elevate Power Management LLC
HydroConventional HydroelectricISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online1984

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Conventional HydroelectricHY2.72.7May 1984Operating—coming soon
GEN2Conventional HydroelectricHY0.10.1May 1984Operating—coming soon

Owner / operator

Operator: Elevate Power Management LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Elevate Power Management LLC100.0%3 MW

Nearby plants

Within 80 km.
Jewett City 13 MW0.6 km
Fusion Solar Center LLC20 MW5.1 km
Plainfield Solar One—5.4 km
Wheelabrator Lisbon15 MW5.4 km
Taftville2 MW6.5 km
Jackson Solar (CT)1 MW7.3 km