← Back to map

Jewett City 1

New London County, Connecticut · EIA plant ID 57602 · Operator: Connecticut Mun Elec Engy Coop
OilPetroleum LiquidsISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor1%gas/coal/oil units, summer MW
Heat rate9,921Btu/kWhfossil units, electric fuel, HHV
First online2010Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%1%2%201220142016201820202022202420260.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,0009,00010,000201220142016201820202022202420269,921 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20110.21.0%9,550
20120.20.9%10,261
20130.31.3%10,278
20140.31.6%10,130
20150.41.6%10,035
20160.31.4%10,118
20170.31.3%10,050
20180.21.1%10,053
20190.21.1%9,978
20200.31.4%10,377
20210.21.1%9,894
20220.21.0%9,851
20230.20.9%9,879
20240.20.9%8,654
20250.10.6%9,921

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
JC1Petroleum LiquidsIC2.62.5Feb 2010Operating—coming soon

Owner / operator

Operator: Connecticut Mun Elec Engy Coop. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Connecticut Mun Elec Engy Coop100.0%3 MW

Nearby plants

Within 80 km.
Wyre Wynd Hydroelectric Project3 MW0.6 km
Wheelabrator Lisbon15 MW5.4 km
Fusion Solar Center LLC20 MW5.5 km
Plainfield Solar One—5.8 km
Taftville2 MW6.3 km
Jackson Solar (CT)1 MW6.9 km