← Back to map

Wheelabrator Lisbon

New London County, Connecticut · EIA plant ID 54758 · Operator: Wheelabrator Environmental Systems
OtherMunicipal Solid WasteISONEBA: ISNE
Nameplate15MWSummer 13 MW
Generators1in service
Net generation101GWh12 mo to Aug 2026
Capacity factor89%other units, summer MW
Heat rate—thermal plants only
First online1995

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202588.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001104.992.1%—
2002120.898.3%—
2003114.6100.7%—
2004115.8101.4%—
2005115.8101.7%—
2006114.8100.8%—
2007115.3101.3%—
2008115.9101.5%—
2009115.1101.0%—
2010111.598.0%—
2011111.297.6%—
2012110.596.7%—
201311089.7%—
2014109.489.2%—
2015107.387.5%—
2016111.490.6%—
2017108.488.4%—
201895.477.8%—
2019100.882.2%—
2020100.982.0%—
2021100.181.7%—
202299.687.5%—
2023101.989.5%—
202499.487.1%—
202599.887.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Municipal Solid WasteST14.613Oct 1995Operating—coming soon

Owner / operator

Operator: Wheelabrator Environmental Systems. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Eastern Conn Res Recvy Auth100.0%15 MW

Nearby plants

Within 80 km.
Taftville2 MW1.4 km
Tunnel21 MW3.2 km
Fusion Solar Center LLC20 MW4.4 km
Tenth Street1 MW5.1 km
CMEEC - Norwich Stott St Solar Hybrid4 MW5.3 km
Jewett City 13 MW5.4 km