Holyoke MA BESS 1Under construction

Hampden County, Massachusetts · EIA plant ID 69551 · Operator: Holyoke MA BESS 1 LLC
BatteryISONEBA: ISNE

5 MW under construction (Batteries), first expected Oct 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 5 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
90915BatteriesBA55planned Oct 2026Under construction—coming soon

Owner / operator

Operator: Holyoke MA BESS 1 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Chicopee BESS—3.1 km
Dwight1 MW3.7 km
Holyoke Solar Cooperative at Mueller3 MW3.8 km
Chemical2 MW4.2 km
Chicopee Granby Road Solar2 MW4.5 km
Cabot Holyoke3 MW4.8 km