Holyoke Solar Cooperative at Mueller

Hampden County, Massachusetts · EIA plant ID 57931 · Operator: Holyoke Solar LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202616.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20110.16.9%—
20124.318.3%—
20134.117.5%—
20145.121.5%—
20153.816.2%—
20164.217.7%—
20173.816.2%—
20183.816.0%—
20193.916.7%—
20204.117.3%—
20213.916.4%—
20224.217.8%—
20233.916.3%—
20243.816.2%—
20253.816.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV2.72.7Dec 2011Operating—coming soon

Owner / operator

Operator: Holyoke Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Holyoke Solar LLC100.0%3 MW

Nearby plants

Within 80 km.
Southampton Solar PV2 MW2.5 km
Holyoke MA BESS 1—3.8 km
GSPP Terrawatt Westfield LLC CSG4 MW4 km
Chemical2 MW6 km
Cabot Holyoke3 MW6.1 km
Chicopee BESS—6.1 km